Puslapio vaizdai
PDF
„ePub“

1841

GARRISON DIVERSION UNIT, MISSOURI RIVER BASIN PROJECT

An act to make certain provisions in connection with the construction of the Garrison diversion unit, Missouri River Basin project, by the Secretary of the Interior. (Act of August 5, 1965, Public Law 89-108, 79 Stat. 433)

[Sec. 1. Garrison diversion unit authorized.]—The general plan for the Missouri-Souris unit of the Missouri River Basin project, heretofore authorized in section 9 of the Flood Control Act of December 22, 1944 (58 Stat. 887), as modified by the report of the Secretary of the Interior contained in House Document Numbered 325, Eighty-sixth Congress, second session, is confirmed and approved under the designation "Garrison diversion unit," and the construction of a development providing for the irrigation of two hundred and fifty thousand acres, municipal and industrial water, fish and wildlife conservation and development, recreation, flood control, and other project purposes shall be prosecuted by the Department of the Interior substantially in accordance with the plans set out in the Bureau of Reclamation report dated November 1962 (revised February 1965) supplemental report to said House Document Numbered 325. (79 Stat. 433)

EXPLANATORY NOTE

Reference in the Text. Section 9 of the Flood Control Act of December 22, 1944

(58 Stat. 887), referred to in the text, appears herein in chronological order.

Sec. 2. [Recreation and fish and wildlife enhancement.]—(a) Subject to the provisions of subsections (b), (c), (d), and (e) of this section, the Secretary is authorized in connection with the Garrison diversion unit (i) to construct, operate, and maintain or provide for the construction, operation, and maintenance of public outdoor recreation and fish and wildlife enhancement facilities, (ii) to acquire or otherwise to include within the unit area such adjacent lands or interests in land as are necessary for present or future public recreation or fish and wildlife use, (iii) to allocate water and reservoir capacity to recreation and fish and wildlife enhancement, and (iv) to provide for the public use and enjoyment of unit lands, facilities, and water areas in a manner coordinated with other unit purposes. The Secretary is further authorized to enter into agreements with Federal agencies or State or local public bodies for the operation, maintenance, and replacement of unit facilities, and to transfer unit lands or facilities to Federal agencies or State or local public bodies by lease or exchange, upon such terms and conditions as will best promote the development and operation of such lands or facilities in the public interest for recreation and fish and wildlife enhancement purposes.

(b) All costs allocated to fish and wildlife enhancement and incurred in connection with waterfowl refuges and waterfowl production areas proposed for Federal administration shall be nonreimbursable.

(c) (1) If, before commencement of construction of the unit, non-Federal public bodies agree to administer for recreation or fish and wildlife enhance

1842

GARRISON DIVERSION UNIT, MISSOURI BASIN

ment or for both of these purposes pursuant to the plan for the development of the unit approved by the Secretary land and water areas which are not included within Federal waterfowl refuges and waterfowl production areas and to bear not less than one-half the separable costs of the unit allocated to either or both of said purposes, as the case may be, and attributable to such areas and all the costs of operation, maintenance, and replacement incurred in connection therewith, the remainder of the separable capital costs so allocated and attributed shall be nonreimbursable.

(2) In the absence of such a preconstruction agreement recreation and fish and wildlife enhancement facilities (other than minimum facilities for the public health and safety at reservoir access points and facilities related to Federal waterfowl refuges and waterfowl production areas) shall not be provided, and the allocation of unit costs shall reflect only the number of visitor days and the value per visitor day estimated to result from such diminished recreation development without reference to lands which may be provided pursuant to subsection (e) of this section.

(d) The non-Federal share of the separable capital costs of the unit allocated to recreation and fish and wildlife enhancement shall be borne by non-Federal interests, under either or both of the following methods as may be determined appropriate by the Secretary: (i) payment, or provision of lands, interests therein, or facilities for the unit; or (ii) repayment, with interest, within fifty years of first use of unit recreation or fish and wildlife enhancement facilities: Provided, That the source of repayment may be limited to entrance and user fees or charges collected at the unit by non-Federal interests if the fee schedule and the portion of fees dedicated to repayment are established on a basis calculated to achieve repayment as aforesaid and are made subject to review and renegotiation at intervals of not more than five years.

(e) Notwithstanding the absence of preconstruction agreements as specified in subsection (c) of this section lands may be acquired in connection with construction of the unit to preserve the recreation and fish and wildlife enhancement potential of the unit.

(1) If non-Federal public bodies agree within ten years after initial unit operation to administer for recreation and fish and wildlife enhancement pursuant to the plan for development of the unit approved by the Secretary land and water areas which are not included within Federal waterfowl refuges and waterfowl production areas and to bear not less than one-half the costs of lands acquired therefor pursuant to this subsection and facilities and project modifications provided for those purposes and all costs of operation, maintenance, and replacement incurred therefor, the remainder of the costs of such lands, facilities, and project modifications shall be nonreimbursable. Such agreement and subsequent development shall not be the basis for any allocation of joint costs of the unit to recreation or fish and wildlife enhancement.

(2) If, within ten years after initial operation of the unit, there is not an executed agreement as specified in paragraph (1) of this subsection, the Secretary may utilize the lands for any lawful purpose within the jurisdiction of the Department of the Interior, or may transfer custody of the land to another

GARRISON DIVERSION UNIT, MISSOURI BASIN

1843

Federal agency for use for any lawful purpose within the jurisdiction of that agency, or may lease the lands to a non-Federal public body, or may transfer the lands to the Administrator of General Services for disposition in accordance with the surplus property laws of the United States. In no case shall the lands be used or made available for use for any purpose in conflict with the purposes for which the project was constructed, and in every case preference shall be given to uses which will preserve and promote the recreation and fish and wildlife enhancement potential of the project or, in the absence thereof, will not detract from that potential.

(f) Subject to the limitations hereinbefore stated, joint capital costs allocated to recreation and fish and wildlife enhancement shall be nonreimbursable.

(g) Costs of means and measures to prevent loss of and damage to fish and wildlife shall be treated as unit costs and allocated among all unit purposes.

(h) As used in this Act, the term "nonreimbursable" shall not be construed to prohibit the imposition of entrance, admission, and other recreation user fees or charges. (79 Stat. 433)

Sec. 3. [Physical and financial integration with comprehensive Missouri River plan.]-The Garrison diversion unit shall be integrated physically and financially with the other Federal works constructed or authorized to be constructed under the comprehensive plan approved by section 9 of the Act of December 22, 1944, as amended and supplemented. The Secretary shall give consideration to returning to the Missouri River to the fullest extent practicable such of the return flows as are not required for beneficial purposes. (79 Stat. 434)

EXPLANATORY NOTE

Reference in the Text. Section 9 of the (58 Stat. 887), referred to in the text, Flood Control Act of December 22, 1944 appears herein in chronological order.

Sec. 4. (a) [Interest rates for Garrison diversion unit.]-The interest rate used for computing interest during construction and interest on the unpaid balance of the capital costs allocated to interest-bearing features of the Garrison diversion unit as authorized in this Act shall be determined by the Secretary of the Treasury as of the beginning of the fiscal year in which construction is initiated, on the basis of the computed average interest rate payable by the Treasury upon its outstanding marketable public obligations, which are neither due nor callable for redemption for fifteen years from date of issue.

(b) [Interest rates for Army power facilities in Missouri River Basin project.]-From and after July 1, 1965, the interest rate on the unamortized balance of the investment allocated to commercial power in facilities constructed or under construction on June 30, 1965, by the Department of the Army in the Missouri River Basin, the commercial power from which is marketed by the Department of the Interior, and in the transmission and marketing facilities associated therewith, shall be 22 per centum per annum. (79 Stat. 435)

Sec. 5. [Basic agricultural commodities-Water delivery restriction.]-For a period of ten years from the date of enactment of this Act, no water from the project authorized by this Act shall be delivered to any water user for the production on newly irrigated lands of any basic agricultural commodity, as

1844

GARRISON DIVERSION UNIT, MISSOURI BASIN

defined in the Agricultural Act of 1949, or any amendment thereof, if the total supply of such commodity for the marketing year in which the bulk of the crop would normally be marketed is in excess of the normal supply as defined in section 301 (b) (10) of the Agricultural Adjustment Act of 1938, as amended, unless the Secretary of Agriculture calls for an increase in production of such commodity in the interest of national security. (79 Stat. 435)

EXPLANATORY NOTE

References in the Text. The definition of "agricultural commodity" in the Agricultural Act of 1949, as amended, referred to in the text, is found at 63 Stat. 1056, 7 U.S.C. § 1428 (c). The definition of "nor

mal supply" in section 301 (b)(10) of the Agricultural Adjustment Act of 1938, as amended, also referred to in the text, is found at 62 Stat. 1251, 7 U.S.C. § 1301 (b) (10). Neither act appears herein.

Sec. 6. [Appropriation authorization.]-There is hereby authorized to be appropriated for construction of the Garrison diversion unit as authorized in this Act, the sum of $207,000,000, plus or minus such amounts, if any, as may be justified by reason of ordinary fluctuations in construction costs as indicated by engineering cost indexes applicable to the types of construction involved. herein. There are also authorized to be appropriated such additional sums as inay be required for operation and maintenance of the unit. (79 Stat. 435)

EXPLANATORY NOTES

Not Codified. This Act is not codified in the U.S. Code.

Legislative History. H.R. 237, Public Law 89-108 in the 89th Congress. Reported in House from Interior and Insular Affairs

May 4, 1965; H.R. Rept. No. 282. Passed
House June 16, 1965. Passed Senate
July 22, 1965. Companion bill S. 34. Re-
ported in Senate from Interior and Insular
Affairs, July 20, 1965; S. Rept. No. 470.

1845

LAKE MEREDITH

Joint Resolution to designate the lake to be formed by the waters impounded by Sanford Dam, Canadian River project, Texas, as "Lake Meredith". (Act of August 31, 1965, Public Law 89-153, 79 Stat. 587.)

[Designation of Lake Meredith.]-The lake to be formed by the waters impounded by Sanford Dam, Canadian River project, Texas, shall hereafter be known as "Lake Meredith" in honor of A. A. Meredith. Any law, regulation, document, or record of the United States in which such lake is designated or referred to shall be held to refer to such lake as "Lake Meredith". (79 Stat. 587) EXPLANATORY NOTES

Not Codified. This Act is not codified in the U.S. Code.

Reference in the Text. The Canadian River project, referred to in the text, was authorized by the Act of December 29, 1950, 64 Stat. 1124. The Act appears herein in chronological order.

Legislative History. H.J. Res. 95, Public

Law 89-153 in the 89th Congress. Reported
in House from Interior and Insular Affairs
March 15, 1965; H.R. Rept. No. 173.
Passed House April 5, 1965. Reported in
Senate from Interior and Insular Affairs
August 12, 1965; S. Rept. No. 578. Passed
Senate August 13, 1965.

267-975-72-vol. III

-26

« AnkstesnisTęsti »