Puslapio vaizdai
PDF
„ePub“

ANNEX B TABLE BASE SYSTEM

COLUMBIA RIVER TREATY

1579

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][subsumed][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][subsumed][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]
[blocks in formation]

19,476,650

The Wells project is not presently under construction; when this project or any other project on the main stem of the
Columbia River is completed, they will be integral components of the base system.
Includes two 13,500 kilowatt units for fish attraction water.
With flashboards.

In determining the base system capabilities with and without Canadian storage the Hungry Horse reservoir storage will be
limited to 3,008,000 acre-feet (normal full pool elevation of 3560 feet) and the Grand Coulee project will not include
the effect of adding flashboards, limiting the storage to 5,072,000 acre-feet (normal full pool elevation of 1288 feet).
The total usable storage of the base system as so adjusted will be 13,000,000 acre-feet.

3128 166

11,598,800 258

1580

COLUMBIA RIVER TREATY

ANNEX TO EXCHANGE OF NOTES DATED JANUARY 22, 1964 BETWEEN THE GOVERNMENTS OF CANADA AND THE UNITED STATES REGARDING THE COLUMBIA RIVER TREATY

PROTOCOL

1. If the United States entity should call upon Canada to operate storage in the Columbia River Basin to meet flood control needs of the United States of America pursuant to Article IV (2) (b) or Article IV (3) of the Treaty, such call shall be made only to the extent necessary to meet forecast flood control needs in the territory of the United States of America that cannot adequately be met by flood control facilities in the United States of America in accordance with the following conditions:

(1) Unless otherwise agreed by the Permanent Engineering Board, the need to use Canadian flood control facilities under Article IV (2)(b) of the Treaty shall be considered to have arisen only in the case of potential floods which could result in a peak discharge in excess of 600,000 cubic feet per second at The Dalles, Oregon, assuming the use of all related storage in the United States of America existing and under construction in January 1961, storage provided by any dam constructed pursuant to Article XII of the Treaty and the Canadian storage described in Article IV (2) (a) of the Treaty.

(2) The United States entity will call upon Canada to operate storage under Article IV (3) of the Treaty only to control potential floods in the United States of America that could not be adequately controlled by all the related storage facilities in the United States of America existing at the expiration of 60 years from the ratification date but in no event shall Canada be required to provide any greater degree of flood control under Article IV (3) of the Treaty than that provided for under Article IV (2) of the Treaty. (3) A call shall be made only if the Canadian entity has been consulted whether the need for flood control is, or is likely to be, such that it cannot be met by the use of flood control facilities in the United States of America in accordance with subparagraphs (1) or (2) of this paragraph. Within ten days of receipt of a call, the Canadian entity will communicate its acceptance, or its rejection or proposals for modification of the call, together with supporting considerations. When the communication indicates rejection or modification of the call the United States entity will review the situation in the light of the communication and subsequent developments and will then withdraw or modify the call if practicable. In the absence of agreement on the call or its terms the United States entity will submit the matter to the Permanent Engineering Board provided for under Article XV of the Treaty for assistance as contemplated in Article XV (2) (c) of the Treaty. The entities will be guided by any instructions issued by the Permanent Engineering Board. If the Permanent Engineering Board does not issue instructions within ten days of receipt of a submission the United States entity may

2.

COLUMBIA RIVER TREATY

1581

renew the call for any part or all of the storage covered in the original call and the Canadian entity shall forthwith honour the request.

In preparing the flood control operating plans in accordance with paragraph 5 of Annex A of the Treaty, and in making calls to operate for flood control pursuant to Article IV (2) (b) and Article IV (3) of the Treaty, every effort will be made to minimize flood damage both in Canada and the United States of America.

3. The exchange of Notes provided for in Article VIII(1) of the Treaty shall take place contemporaneously with the exchange of the Instruments of Ratification of the Treaty provided for in Article XX of the Treaty.

4.(1) During the period and to the extent that the sale of Canada's entitlement to downstream power benefits within the United States of America as a result of an exchange of Notes pursuant to Article VIII(1) of the Treaty relieves the United States of America of its obligation to provide eastwest standby transmission service as called for by Article X(1) of the Treaty, Canada is not required to make payment for the east-west standby transmission service with regard to Canada's entitlement to downstream power benefits sold in the United States of America.

(2) The United States of America is not entitled to any payments of the character set out in subparagraph (1) of this paragraph in respect of that portion of Canada's entitlement to downstream power benefits delivered by the United States of America to Canada at any point on the Canada-United States of America boundary other than at a point near Oliver, British Columbia, and the United States of America is not required to provide the east-west standby transmission service referred to in subparagraph (1) of this paragraph in respect of the portion of Canada's entitlement to downstream power benefits which is so delivered. Inasmuch as control of historic streamflows of the Kootenay River by the dam provided for in Article XII(1) of the Treaty would result in more than 200,000 kilowatt years per annum of energy benefit downstream in Canada, as well as important flood control protection to Canada, and the operation of that dam is therefore of concern to Canada, the entities shall, pursuant to Article XIV(2)(a) of the Treaty, cooperate on a continuing basis to coordinate the operation of that dam with the operation of hydroelectric plants on the Kootenay River and elsewhere in Canada in accordance with the provisions of Article XII (5) and Article XII (6) of the Treaty.

5.

6.(1) Canada and the United States of America are in agreement that Article XIII (1) of the Treaty provides to each of them a right to divert water for a consumptive use.

7.

(2) Any diversion of water from the Kootenay River when once instituted under the provisions of Article XIII of the Treaty is not subject to any limitation as to time.

As contemplated by Article IV(1) of the Treaty, Canada shall operate the Canadian storage in accordance with Annex A and hydroelectric operating

1582

COLUMBIA RIVER TREATY

plans made thereunder. Also, as contemplated by Annexes A and B of the Treaty and Article XIV (2) (k) of the Treaty, these operating plans before they are agreed to by the entities will be conditioned as follows:

8.

(1) As the downstream power benefits credited to Canadian storage decrease with time, the storage required to be operated by Canada pursuant to paragraphs 6 and 9 of Annex A of the Treaty, will be that required to produce those benefits.

(2) The hydroelectric operating plans, which will be based on Step I of the studies referred to in paragraph 7 of Annex B of the Treaty, will provide a reservoir-balance relationship for each month for the whole of the Canadian storage committed rather than a separate relationship for each of the three Canadian storages. Subject to compliance with any detailed operating plan agreed to by the entities as permitted by Article XIV (2) (k) of the Treaty, the manner of operation which will achieve the specific storage or release of storage called for in a hydroelectric operating plan consistent with optimum storage use will be at the discretion of the Canadian entity.

(3) Optimum power generation at-site in Canada and downstream in Canada and the United States of America referred to in paragraph 7 of Annex A of the Treaty will include power generation at-site and downstream in Canada of the Canadian storages referred to in Article II (2) of the Treaty, power generation in Canada which is coordinated therewith, downstream power benefits from the Canadian storage which are produced in the United States of America and measured under the terms of Annex B of the Treaty, power generation in the Pacific Northwest Area of the United States of America and power generation coordinated therewith.

The determination of downstream power benefits pursuant to Annex B of the Treaty, in respect of each year until the expiration of thirty years from the commencement of full operation in accordance with Article IV of the Treaty of that portion of the Canadian storage described in Article II of the Treaty which is last placed in full operation, and thereafter until otherwise agreed upon by the entities, shall be based upon stream flows for the thirty-year period beginning July 1928 as contained in the report entitled "Extension of Modified Flows Through 1958-Columbia River Basin" and dated June 1960, as amended and supplemented to June 29, 1961, by the Water Management Subcommittee of the Columbia Basin Inter-Agency Committee.

9.(1) Each load used in making the determinations required by Steps II and III of paragraph 7 of Annex B of the Treaty shall have the same shape as the load of the Pacific Northwest area as that area is defined in that paragraph.

(2) The capacity credit of Canadian storage shall not exceed the difference between the firm load carrying capabilities of the projects and installations included in Step II of paragraph 7 of Annex B of the Treaty and the

COLUMBIA RIVER TREATY

1583

10.

project and installations included in Step III of paragraph 7 of Annex B of the Treaty.

In making all determinations required by Annex B of the Treaty the loads used shall include the power required for pumping water for consumptive use into the Banks Equalizing Reservoir of the Columbia Basin Federal Reclamation Project but mention of this particular load is not intended in any way to exclude from those loads any use of power that would normally be part of such loads.

11.

In the event operation of any of the Canadian storages is commenced at a time which would result in the United States of America receiving flood protection for periods longer than those on which the amounts of flood control payments to Canada set forth in Article VI(1) of the Treaty are based, the United States of America and Canada shall consult as to the adjustments, if any, in the flood control payments that may be equitable in the light of all relevant factors. Any adjustment would be calculated over the longer period or periods on the same basis and in the same manner as the calculation of the amounts set forth in Article VI(1) of the Treaty. The consultations shall begin promptly upon the determination of definite dates for the commencement of operation of the Canadian storages.

12. Canada and the United States of America are in agreement that the Treaty does not establish any general principle or precedent applicable to waters other than those of the Columbia River Basin and does not detract from the application of the Boundary Waters Treaty, 1909, to other waters.

The Secretary of State to the Canadian Secretary of State for External Affairs DEPARTMENT OF STATE

SIR:

WASHINGTON
January 22, 1964

I have the honor to refer to the discussions which have been held between representatives of the Government of Canada and of the Government of the United States of America regarding a sale of Canada's entitlement to downstream power benefits under the Treaty between Canada and the United States of America relating to cooperative development of the water resources of the Columbia River Basin, signed on January 17, 1961.

On the basis of these discussions my Government understands that the two Governments recognize that it would be in the public interest of both countries if Canada's entitlement to downstream power benefits could be disposed of, as contemplated by Article VIII of the Treaty, in accordance with general conditions and limits similar to those set out in detail in the attachment hereto, and further, that before such a disposition can be concluded and confirmed by the two

« AnkstesnisTęsti »